Definitely need a visual record so here are a few pictures of the progress so far:
Starting from the front, getting ready to cut out the place for the front window. |
Now I have it right. |
Window in place on the inner core wall. |
Side wall with the window in place |
The other side with both windows cut out |
And now with the windows in place |
The back wall with the window in place |
Here is the back wall (before cutting out the window) lined up with the false front with the rear roof support. |
Close up on the front of the lean to. A couple of nicks with the knife that I'll have to clean up later. |
The main building pieces. Again the vertical lines are where the battens will be glued. |
A closer shot of the main building parts. Still need to get that doorway cut out. |
good progress !
ReplyDeleteI'm waiting the next step(s) ...
The next steps will have to wait for the weekend now. I didn't quite grab everything I needed so I don't have enough material for the floor or the right tools to distress the siding. I might be able to work on some of the parts for the bakery though. I'll have to plan my packing better next time.
ReplyDelete