Unfortunately the tiling crew was down a man and it took three days to tile and a fourth to grout before we could move forward to fixing the drywall.
Hardibacker down, ready to remove some of the extraneous piping. Here is the 35# dog for scale. |
Hardibacker down, extra stuff removed. One 10# cat for scale. |
End of day three for tiling. |
Tile and grout finished. One large dog for scale and claiming the room. |
Looking to the outside, love the tile. Another large dog for scale. |