More Stuff

Friday, July 15, 2022

Outbuilding construction - OmniWall is up

I finished getting all the Omniwall units up and have kind of thrown the organizational bits up on them. I sure this will change as soon as we get tools into place.  Now I need to get the exhaust fan into place up in the south loft. I'm going to add a dust filtration unit between the joists towards this end as well. This will be on top of a modified single stage collector (for the larger tools with 4" ports) and a hacked together dust vac to handle the little chores and smaller tools.


These are 16" Omniwall Panels, currently stocked with paper towel holders, screw driver, wrench and plier racks. Have to figure out how to get the gouges on these. I have some larger magnetic pads that can go on these but I'm hoping that one of the racks will hold them. Just haven't had time to experiment with them yet.

So the northeast corner with the shelf unit in place and the blinding light from the skylight coming in.

You can see all four panels here (barely).

And the southeast corner. Its a lot brighter with the lights on!




No comments:

Post a Comment