I was getting ready to break out the oil paints to start weathering the DV Ross building when I realized that I needed to cut the curb down for the loading dock. I used a knife and a file to get it close enough. Of course that ruined all the paint work. I re-primed this area and then went over it with the Vallejo Highlight US Tckr. Now it just needs to cure thoroughly before I start smearing oil paint over everything.
|
A high level look at the curb cut. |
|
A slightly lower level look, just to show how far down I cut it. |
|
Primed and ready for paint. |
No comments:
Post a Comment