Lots going on around here and I haven't found a lot of time to work on Building #1. This is the accumulation of more than a few short build sessions.
There is still an awful lot to do and I'm trying not to rush to the finish so some of the little things that have cropped up aren't as frustrating as they could be. First off running out of blades, this thing is eating blades so I broke down and bought a big pack of #11 blades, it should be enough to see me through this build.
Here are where things stand a the moment:
|
Rail side wall. Needs sills, lintels and a concrete band, |
|
Alley wall, just needs the lower brickwork, stonework and a door. |
|
Alley wall from the inside. |
|
Inside of the street wall, cuts are pretty rough at this point. My blades were starting to get dull. Not to concerned since viewing the inside will be tough. |
|
All four walls, in this shot I'm gluing the buttresses on the creek side wall. |
|
Looking at the street side wall before the windows were cut. |
|
The rail side with everything cut out at this point. |
|
A sanity check that everything is still fitting together. |