I finished getting all the Omniwall units up and have kind of thrown the organizational bits up on them. I sure this will change as soon as we get tools into place. Now I need to get the exhaust fan into place up in the south loft. I'm going to add a dust filtration unit between the joists towards this end as well. This will be on top of a modified single stage collector (for the larger tools with 4" ports) and a hacked together dust vac to handle the little chores and smaller tools.
|
These are 16" Omniwall Panels, currently stocked with paper towel holders, screw driver, wrench and plier racks. Have to figure out how to get the gouges on these. I have some larger magnetic pads that can go on these but I'm hoping that one of the racks will hold them. Just haven't had time to experiment with them yet. |
|
So the northeast corner with the shelf unit in place and the blinding light from the skylight coming in. |
|
You can see all four panels here (barely). |
|
And the southeast corner. Its a lot brighter with the lights on! |
No comments:
Post a Comment