Quotes

Life is short, break the rules. Forgive quickly, kiss slowly. Love truly, laugh uncontrollably and never regret anything that makes you smile. - Samuel Longhorne Clemens (Mark Twain)

Tuesday, August 8, 2023

World War II Project - 28mm Village Church - Sarissa Precision - The Roofs - Part 6

A short one today. I finished off shingling the primary roofs. At this point I'm toying around with the idea of going ahead and gluing them together so that I can finish off the areas where the roof lines meet before I paint it. I still need to shingle the steeple peak as well, put I need to move back to the walls. I have been looking forward to finishing off the windows ever since the stained glass arrived.

Starting to layout the shingles. The angled cut is where the short roof meets the long roof.

And one side done, 3 more to go.

I wanted to make sure that the steeple still fit into place before I shingled the other side.

And work begins on the other side.

Finished! Nice match at the top, that will never happen again.

This all that's left of all the shingles I cut out in the first run. Time to find another box.

Shingles cut and one long side done.

And the steeple still fits!






Friday, August 4, 2023

World War II Project - 28mm Village Church - Sarissa Precision - The Roofs - Part 5

And the tedious part begins, adding the shingle strips to the roofs. Not much to say, other than to remember to snip the shingles before you apply glue and only apply glue to the 1/8" strip so you can manipulate the shingles a bit once they are in place. I do use clamps and weights just to make sure everything stays in place while the glue sets. Titebond is my glue of choice, mostly because I have a lot of around in the wood shop. Its pretty serious overkill for applying shingles but its what I have. Any PVA/Elmer's glue will do. One advantage Titebond has is it sets up pretty fast so I once I get started I can move pretty quickly.

I let the glue set for at least an hour before I go in and trim up the shingles. That ensures that the cardboard isn't mushy with wet glue.


First Strip. Without thinking I applied glue to the entire back of the first three strips without thinking about what I wanted to do.

Working my way up.

A few minutes with some serious weight on it.

With one side done, I started alternating back and forth between the two roofs.

The untrimmed look, mostly due to the need to stagger the shingle rows.

Shingles all done on the two small roofs.

All trimmed up


Dry fitting the roofs and marking where the singles will start on the long roof. When its done I will glue all these pieces together to create one large structure and I don't need to apply shingles where I don't need them.

One of my British Paratroopers has found their way inside.




Thursday, August 3, 2023

World War II Project - 28mm Village Church - Sarissa Precision - The Roofs - Part 4

I'm still cutting more shingles because you always need more than you think. One thing to keep in mind, which really applies to just about everything, if you are applying something to one side of a piece you do need to do some kind of prep on the other side. I didn't worry about the walls because I was gluing to both sides. However, the shingles will only be applied to one side of the roof structure which means something needs to be applied to the other side to keep warping down.

In this case I opted to prime the inside of the roof with a brown primer. I had brief thoughts of adding beams and interesting interior roof details and actually managed to not do any of that. I went with brown because I thought black would be to stark and brown would at least hint to some kind of wood structure.

Not a lot of pics this time. But here are the main sections all primed with brown. The mottled look comes from two different issues. First I started off with a grey primer that was just to old and gave me a lot of problems coming out of the airbrush so there was partial coverage with that. Second MDF soaks up paint. It takes 2-3 coats to get something nice and even. This has two coats and it was just starting to even out. Then I figured what's the point the only time anyone will see it is when the pull the roof off and set it aside.


Tuesday, August 1, 2023

World War II Project - 28mm Village Church - Sarissa Precision - The Roofs - Part 3

Still stalling on doing the shingles so I worked on the extra supports for the long roof. I discovered that there was plenty of material left to work with on the MDF sprues (good thing I never throw anything away).  And following a suggestion in the comments I traced out the supports from the gable ends and made a couple of templates. It was easier than I thought it would be. The roof sections meet at a 90 degree angle so I just laid a piece of paper in there to match the angle and traced the bottom edge, complete with the notches. A little work with a knife and a file and I was probably done in 15 minutes or so. I glued those into place, double checked and adjusted the fit a bit and I was done. Now I really need to do the shingles.


Paper Templates

Glued to the remains of an MDF sprue

Initial cut. Notches have not been cut yet.

Added some straight lines to give me a guide.

Three of my 1-2-3 blocks to hold everything in place while the glue sets. Of course the piece slipped a bit without me know it.

This time I used all four of my blocks, the fourth is used to make sure the piece stays vertical. It still slipped a bit

And what it looks like in the end. Basically I added the supports on either side of the intersection of the walls in the center.