A short one today. I finished off shingling the primary roofs. At this point I'm toying around with the idea of going ahead and gluing them together so that I can finish off the areas where the roof lines meet before I paint it. I still need to shingle the steeple peak as well, put I need to move back to the walls. I have been looking forward to finishing off the windows ever since the stained glass arrived.
 |
Starting to layout the shingles. The angled cut is where the short roof meets the long roof. |
 |
And one side done, 3 more to go. |
 |
I wanted to make sure that the steeple still fit into place before I shingled the other side. |
 |
And work begins on the other side. |
 |
Finished! Nice match at the top, that will never happen again. |
 |
This all that's left of all the shingles I cut out in the first run. Time to find another box. |
 |
Shingles cut and one long side done. |
 |
And the steeple still fits! |
No comments:
Post a Comment